The world’s highest railway bridge, the Chenab Bridge in the Kashmir Valley, is well on its way to connecting the region with the Indian railway network. The Minister of Railways, Communications, Electronics, and Information Technology, Ashwini Vaishnaw, recently paid a visit to the bridge to inspect the progress of the USBRL project.
During his visit, Minister Vaishnaw made a trolley inspection of the bridge and tunnel and commended the hard work and dedication of all railway staff involved in the project. He also interacted with the media and announced that the USBRL project would be completed by Jan/Feb-2024, with an allocation of Rs. 6000 crore made in the year 2022-23. Before 2014, this allocation was only Rs. 800 crore per year.
The Minister also announced that a specially built Vande Bharat train would be started after connecting with the Udhampur-Srinagar-Baramula train service. Additionally, a special training academy for engineers would be set up at Jammu.
The USBRL project is progressing well, and the Minister has shown a laser-sharp focus on the country’s development. The Chenab Bridge and Tunnel are poised to become vital links connecting the Kashmir Valley to the rest of India’s railway network.
ડિજિટલ એરેસ્ટ ની નવી મોડેસ ઓપરેન્ડી વર્ચ્યુઅલ નંબરનો ઉપયોગ કરતા સાયબર માફિયા ડિજિટલ એરેસ્ટના કેસોમાં…
થર્ટીફર્સ્ટ અગાઉ અઢળક દારૂ, ચરસ, ગાંજો ઝડપાયો રાજ્યમાં થર્ટીફર્સ્ટ ની ઉજવણી કરવા યુવાધન ઘેલું…
શું તમે પણ રાત્રે સૂતી વખતે સ્વેટર અને મોજા પહેરી સૂઈ જાઓ છો !?.. આ…
શિયાળો એટલે સ્વાસ્થ્ય અને શરીરને આખા વર્ષ માટે ચાર્જ કરવાની ઋતુ શિયાળો એટલે આખા વર્ષ…
"ગુજરાતમાં સ્માર્ટ મીટરિંગ પ્રોજેક્ટ: એનર્જી માટે એક સ્માર્ટ ભવિષ્ય" વીજ વિતરણ કંપનીઓની બિલિંગ સેવાઓમાં ક્રાંતિ…
આરોગ્ય સેવા :ભગવાનનું સ્વરૂપ ગણાતા ડોકટરો 'કસાઈ' કેમ બની રહ્યા છે..? પૈસાને પરમેશ્વર ગણી પૂજાતા…